PROJECT MANAGEMENT

We are your solution partner in every step of your projects from planning to controlling.

Construction site

PROJECT MANAGEMENT and CONSULTANCY

We provide time and cash optimization with the reports to be prepared for the healthy progress of your projects by creating the construction site planning chain with agreement and proposal evaluation in your projects.

With our management approach, which covers not only the construction phase of the projects but also the processes after their completion, we complete your projects on the determined schedule, and we pave the way for safe and healthy structures with economically optimum evaluations.

​​

  • Project and Building Management

  • Planning

  • Technical Consulting

  • Project Feasibility Studies

  • Building Information Modeling  

  • Tender Preparation

  • Cost/Profit Analysis

  • Procurement Planning

Planning

We make comprehensive evaluations on issues such as budget, calendar, cost, profit and loss, and we plan with the most practical and correct approaches.

 

Tender Bid Preparation

Final accounts and approximate calculations in private and public tenders are prepared by adhering to the regulations and the free market, thus increasing your probability of getting a tender.

consultancy  

We offer the necessary solution for your problems such as all kinds of techniques, costs and applications. With project consultancy, we are at your side with solution-oriented approaches in all your Engineering, Architecture and Interior Architecture works.

Reviewing Construction Plans

CONSULTING

As Omnia Kreatif, we are with you to foresee possible problems in the integrity of the construction works, to warn the employer about taking precautions, and to prevent loss of time and money.

Thanks to our engineering services, we analyze the technical part of your work with our professional team and report these analysis results to you successfully. We improve the health of your project in various steps by preparing error reports and starting to work on their resolution upon request.

Interactions in the construction site conditions, changes in the employer's decision, problems in the supply of materials, changes in the work organization and similar situations may require a reinterpretation of the project. Immediate decision changes can cause problems in the next construction step. At this point, as Omnia Kreatif, we are with you to foresee possible problems in the integrity of the construction works, to warn the employer to take precautions, and to prevent loss of time and money.

Designs in accordance with regulations; can have a general idea about the project with the preliminary project, after the decision about the cost, material, carrier system  We prepare layouts and reports by making comprehensive analysis in the application project. We make interior architecture and architectural projects based on quality and satisfaction in line with your ideas at every step.

 

survey

We take a survey project without an architectural project or when necessary for static analysis and technical reports.

 

Urban transformation

After the risky building analysis, buildings that are considered dangerous enter into urban transformation. We provide you with all the necessary procedures for this.

Fixing the Roof

BUILDING CONTRACTING

We sign our construction agreements, which are prepared according to the conditions you request, either by determining a fixed price and using turnkey or cost-proportioned systems.

We carry out Application Control and Application Management studies by taking all necessary measures to ensure project-application coordination between different disciplines such as architecture, civil engineering, mechanics, electricity and landscaping and to carry out the project correctly.

We sign our construction agreements, which are prepared according to the conditions you request, either by determining a fixed price and using turnkey or cost-proportioned systems.

We offer both engineering services and architectural solutions with our creative architects and engineers. Being aware of how important it is to be determined from contract criteria, we maintain the desired quality standard. We pay great attention to the delivery of applications by our teams within the specified time. We provide you with minimum time loss and maximum satisfaction in all our turnkey projects.